|
发表于 2014-12-9 07:02:46
|
显示全部楼层
Shenyang daily 2012-07-20
the same situation also appears in the road of democracy. Because adjacent to Taiyuan Street shopping district,moncler pas cher, before Chinese road not closed democracy Road traffic pressure on the great. Reporters on the same day in the democratic road to see: because of limited parking spaces, the original is not too wide of the road to democracy is parked with many private car and other vehicles. The original road to democracy is a 324 Road, 327 Road, 225 Road, etc.
reporters at the scene,Hollister Online Shop, because part of private owners and social vehicle deficiencies of Zhonghua Road closed to prepare, on the road is not very mature, so in the street, stop and go, from time to time on the road traffic police on duty to ask the way. This also artificially slowed traffic speed. In addition,nike tn requin pas cher, because the docked along the bus too much, plus the bus itself head comparison,mulberry outlet uk, whenever there is out of the bus station, near the road there will be a temporary stagnation. From the Shenyang Railway Station north to Shenyang Railway Station, Taiyuan street,air max one pas cher, but the road north two km road, this road 221 and it lasted 40 minutes. Normally even in the morning and evening rush hour, this section of the road to say as long as 10 to 15 minutes can be through.
19 is the first working day after the Chinese road closed. On the same day at seven thirty in the morning,air max pas cher, the reporter went to the closed section of the actual situation, on-site experience 21 bus line diversion of the Chinese road closed.
after the morning peak, the road surrounding region police force has the adjustment, the results of north two road appears again vehicle retention phenomenon. On the same day at ten thirty, the reporters in a peaceful street and north two street intersection to see: Vehicle here running speed becomes very slow. Because the left turn signal lamp time is very short, in the traffic police under the command of a 207 road to the straight turning.
10 minutes,nike tn requin pas cher, waiting in the bus queue nearly 50 people. About 10 minutes later,cheap air max shoes, and finally to the car. The driver told reporters, because the road is closed, many buses were transferred to the two street to the north, the road is full of buses. He had a hard time coming.
The early peak of
road parking lot
flat peak
Failed to
like
Shenyang daily 2012-07-20
of the day at seven thirty in the morning, reporter in the 221 terminal Road, WAL-MART door to wait for the bus.
in order to ensure the vehicles, the reporter on the scene saw: North Street and South Road has been canceled some parking. While the original single national street, Lanzhou street,cheap louis vuitton bags, road, also changed the double line.
congestion eased
"originally ran a circle need a little more than 2 hours, the result is now a circle ran 3.5 hours!" 207 road high captain told reporters,mulberry handabags outlet, because the team several trolley blocking don't come out of the north two street, then simply did not dare to put the car into scheduling outside, afraid to put out don't come back.
to the north of two road after, the reporter saw: this road 221 around,original ugg boots, all vehicles. Every once in a while and have more traffic and directing traffic at the scene. But because of too many cars,peuterey outlet, buses can only move slowly on the road.
相关的主题文章:
[/url]
[url=http://bluewaternf.com/guest_book/index.php]
and achieved a series of important and innovative achievements
manuals", will power operation process, community work function, specific services to the residents of the public, take the initiative to accept the supervision of the residents. |
|